# Space Platform Construction Plan MD5: 3dc079e2e3436a9d40dbe4806430e435 Total launches: 3 (1 auto + 2 manual) ## Combined manifest Total weight: 2800.0 kg - (48) space-platform-foundation (960.0 kg) - (4) assembling-machine-2 (80.0 kg) - (2) solar-panel (40.0 kg) - (1) asteroid-collector (100.0 kg) - (13) inserter (260.0 kg) - (1) electric-furnace (20.0 kg) - (1) crusher (100.0 kg) - (2) arithmetic-combinator (40.0 kg) - (2) constant-combinator (40.0 kg) - (8) efficiency-module (160.0 kg) - (1) space-platform-starter-pack (1000.0 kg) # 1 auto launches ## Launch #1 (1000.0 kg) - (1) space-platform-starter-pack (1000.0 kg) # 2 manual launches ## Launch #2 (1000.0 kg) - (48) space-platform-foundation (960.0 kg) - (2) arithmetic-combinator (40.0 kg) ## Launch #3 (800.0 kg) - (1) crusher (100.0 kg) - (1) asteroid-collector (100.0 kg) - (2) solar-panel (40.0 kg) - (13) inserter (260.0 kg) - (1) electric-furnace (20.0 kg) - (8) efficiency-module (160.0 kg) - (2) constant-combinator (40.0 kg) - (4) assembling-machine-2 (80.0 kg)