# Space Platform Construction Plan MD5: 2b68bba8c9bfd8abbf7ba547a2175c8f Label: Space Science Total launches: 5 (3 auto + 2 manual) ## Combined manifest Total weight: 4900.0 kg - (112) space-platform-foundation (2240.0 kg) - (4) assembling-machine-2 (80.0 kg) - (4) speed-module (80.0 kg) - (12) efficiency-module (240.0 kg) - (4) asteroid-collector (400.0 kg) - (20) fast-inserter (400.0 kg) - (3) crusher (300.0 kg) - (1) constant-combinator (20.0 kg) - (5) solar-panel (100.0 kg) - (1) arithmetic-combinator (20.0 kg) - (1) electric-furnace (20.0 kg) - (1) space-platform-starter-pack (1000.0 kg) # 3 auto launches ## Launch #1 (1000.0 kg) - (1) space-platform-starter-pack (1000.0 kg) ## Launch #2 (1000.0 kg) - (50) space-platform-foundation (1000.0 kg) ## Launch #3 (1000.0 kg) - (50) space-platform-foundation (1000.0 kg) # 2 manual launches ## Launch #4 (1000.0 kg) - (12) space-platform-foundation (240.0 kg) - (3) crusher (300.0 kg) - (4) asteroid-collector (400.0 kg) - (3) speed-module (60.0 kg) ## Launch #5 (900.0 kg) - (1) speed-module (20.0 kg) - (5) solar-panel (100.0 kg) - (20) fast-inserter (400.0 kg) - (1) electric-furnace (20.0 kg) - (12) efficiency-module (240.0 kg) - (1) constant-combinator (20.0 kg) - (4) assembling-machine-2 (80.0 kg) - (1) arithmetic-combinator (20.0 kg)