# Space Platform Construction Plan MD5: 169b85c6e67ef73ae22b6b5091d5d80b Total launches: 6 (3 auto + 3 manual) ## Combined manifest Total weight: 5560.0 kg - (134) space-platform-foundation (2680.0 kg) - (4) solar-panel (80.0 kg) - (3) crusher (300.0 kg) - (20) efficiency-module (400.0 kg) - (6) assembling-machine-2 (120.0 kg) - (4) asteroid-collector (400.0 kg) - (16) inserter (320.0 kg) - (4) fast-inserter (80.0 kg) - (7) long-handed-inserter (140.0 kg) - (1) electric-furnace (20.0 kg) - (1) accumulator (20.0 kg) - (1) space-platform-starter-pack (1000.0 kg) # 3 auto launches ## Launch #1 (1000.0 kg) - (1) space-platform-starter-pack (1000.0 kg) ## Launch #2 (1000.0 kg) - (50) space-platform-foundation (1000.0 kg) ## Launch #3 (1000.0 kg) - (50) space-platform-foundation (1000.0 kg) # 3 manual launches ## Launch #4 (1000.0 kg) - (34) space-platform-foundation (680.0 kg) - (3) crusher (300.0 kg) - (1) accumulator (20.0 kg) ## Launch #5 (1000.0 kg) - (4) asteroid-collector (400.0 kg) - (4) solar-panel (80.0 kg) - (7) long-handed-inserter (140.0 kg) - (16) inserter (320.0 kg) - (3) fast-inserter (60.0 kg) ## Launch #6 (560.0 kg) - (1) fast-inserter (20.0 kg) - (1) electric-furnace (20.0 kg) - (20) efficiency-module (400.0 kg) - (6) assembling-machine-2 (120.0 kg)