# Space Platform Construction Plan MD5: d46da8c11341092cdde7e0f194ac7a53 Total launches: 6 (3 auto + 3 manual) ## Combined manifest Total weight: 5540.0 kg - (146) space-platform-foundation (2920.0 kg) - (4) asteroid-collector (400.0 kg) - (3) crusher (300.0 kg) - (30) inserter (600.0 kg) - (1) electric-furnace (20.0 kg) - (3) assembling-machine-2 (60.0 kg) - (6) solar-panel (120.0 kg) - (6) accumulator (120.0 kg) - (1) space-platform-starter-pack (1000.0 kg) # 3 auto launches ## Launch #1 (1000.0 kg) - (1) space-platform-starter-pack (1000.0 kg) ## Launch #2 (1000.0 kg) - (50) space-platform-foundation (1000.0 kg) ## Launch #3 (1000.0 kg) - (50) space-platform-foundation (1000.0 kg) # 3 manual launches ## Launch #4 (1000.0 kg) - (46) space-platform-foundation (920.0 kg) - (4) accumulator (80.0 kg) ## Launch #5 (1000.0 kg) - (3) crusher (300.0 kg) - (4) asteroid-collector (400.0 kg) - (6) solar-panel (120.0 kg) - (9) inserter (180.0 kg) ## Launch #6 (540.0 kg) - (21) inserter (420.0 kg) - (1) electric-furnace (20.0 kg) - (3) assembling-machine-2 (60.0 kg) - (2) accumulator (40.0 kg)